Hospitals

Oakland Kaiser Hospital

The new Kaiser Permanente Oakland Medical Center consists of a 12-story, 349-bed hospital, which replaced the hospital across MacArthur Boulevard. The construction was part of the state-mandated earthquake safety retrofit of all California hospitals. NBBJ served as the project’s architect and McCarthy Builders as General Contractor. Olson Steel was brought in to handle the detailing, […]

Santa Clara Valley Medical Center

The Santa Clara Valley Medical Center’s major overhaul was a $966 million construction project, which retrofited the hospital and medical buildings on the main campus at 551 S. Bascom Ave. in San Jose. The second phase, which costed an over $400million, included the construction of a 140-bed building. Olson Steel provided the metal stairs, stair […]

Stanford Hospital

Stanford Hospital & Clinics rebuilt its 1950s-era hospital facilities to accommodate new medical technology, increase capacity needs and meet seismic safety requirements. The new 824,000 square foot hospital facility features 368 individual patient rooms, an enlarged Level-1 trauma center, and an emergency department more than twice the size of its existing space and new surgical, […]

Kaiser San Leandro CUP

The Kaiser San Leandro Hospital project consisted of a 262-bed, six-story, OSHPD 1 Hospital, and a 30,000 square foot Central Utility Plant which consists of two levels. Olson Steel was contracted on the Central Utility Plant (C.U.P.) to handle the detailing, fabrication and erection of main structural steel, brace columns, roof screen frame, metal panel […]

Mercy Medical MOB

The Mercy Medical Pavilion is a three-story, 62,500 square foot Medical Office Building located on the campus of the Mercy Medical Center – Merced in Merced, California. Olson Steel was contracted by Swinerton Builders to handle detailing, fabrication and erection of the structural steel, including columns, beams and diagonal braces, steel stairs and rails, and elevator […]

Palo Alto Medical Foundation

Palo Alto Medical Foundation’s San Carlos Center, at 301 Industrial Road in San Carlos, is a state-of–the-art, full service medical center. The integrated campus, including an outpatient medical center and a hospital, was constructed in two phases. Olson Steel was brought in to assist in completing the miscellaneous steel package and played a critical role in […]

Bakersfield Memorial Hospital Valley Medical

Bakersfield Memorial Hospital added a new five-story tower and 70,000 square feet to the hospital. Numerous upgrades to the basement footings, columns, and beams were required to meet the state’s seismic standards for hospitals. The physical structure of Bakersfield Memorial Hospital now meets California earthquake standards. Olson Steel handled all Steel requirements on this project, […]

Sutter Medical Center (Castro Valley)

Sutter Medical Center (Castro Valley) was the first in the industry to use an 11-party integrated project delivery contract (in which the owner and 10 participants are contractually required to collaborate). The 130-bed, 230,000-sq.-ft. acute care hospital was delivered ahead of schedule and at the $320 million set target cost. The new center includes all […]