Monterey Bay Aquarium

Designed by EHDD Architecture, the Sea Otter Exhibit remodel project was managed by Rudolf and Sletten, the renovation includes updates to the 2-story, 55,000-gallon sea otter tank, support equipment, holding tank, roof top deck, and surrounding non-public work space. A remodel of the pre-existing café, kitchen, and server into a full service, sit-down restaurant was also finalized at the Aquarium. Olson Steel handled all structural steel requirements and miscellaneous metal requirements for both the Sea Otter Exhibit and the café renovation.